Summer 2018
Posted June 13, 2018
- The Science East classroom installation continues and will be ready for the fall semester
- The temporary swing spaces are nearly ready for the School of Business faculty to move into, so the renovation of Founders Hall can begin this fall
- Sidewalk, water valves and fire hydrants are being replaced, while synthetic turf has been installed to refresh the Korte Stadium soccer field
- At the MUC, you’ll notice a big wooden box that is safety protection as the skylights and the Goshen Lounge floor and seating areas are being replaced
- On the Alton campus, building boilers and concrete repairs are underway
- At the East St. Louis Higher Education Campus, resurfacing of the asphalt roads will begin July 9